SECTION 10: COMMISSIONING
41 of 85
10.1.1 Louvers
Where fitted, the air delivery louvers need to be set
during commissioning to give the required air
distribution.
10.1.2 Electrical Checks
All pre-commission checks must be carried out
before commissioning the heater.
1. Check that all site wiring is connected in
accordance with the appropriate wiring dia-
grams shown on Page 28, Section 9.3 through
Page 39, Section 9.14.
2. Check the correct fuse size is fitted in the local
supply isolator. See Page 11, Section 4.4.
10.1.3 Polarity Test - 1 Ø
10.1.4 Polarity Test - 3 Ø
Voltage between each phase L1, L2 and L3 and
Earth or Neutral should be approximately 230 V.
Voltage between any 2 phases should be
approximately 400 V. Test Neutral to Earth as single
phase.
10.1.5 Fan Rotation Check
Switch on the electricity supply at the isolator and
the manual switch to "fan on" (if no remote fan switch
is installed, press the white button on the fan/limit
thermostat). On 3 Ø heaters, check the rotation of
the main fan. Rotation should be in the direction of
the arrow shown on the fan housing. If rotation is not
correct, turn off the isolator and change over any
t
wo of the incoming supply phases and recheck. It
will be necessary to remove the lower front or right
side panel to see fan rotation.
10.1.6 Fan Motor Overload Check
On 3 Ø belt drive heaters, check the correct settings
of the fan motor overload. This should be 0.2 A
above the rated current on the heater data plate.
See Page 11, Figure 4.4. The belt tension and
alignment should also be checked and adjusted as
shown on Page 52, Figure 23.
10.1.7 Mechanical Checks
1. Check that the flue is installed in accordance
with these instructions and local regulations.
2. Check that the settings of the Combination Fan/
Limit thermostat are correct - See Page 41,
Figure 17.
Figure 17: Combination Thermostat (all models)
10.1.8 Burner (gas heaters)
Two-stage (High/Low) burners have additional
specific requirements. Follow the manufacturer's
instructions, the data provided on Page 11, Section
4.4 through Page 13, Section 4.7, and the
commissioning instructions on See Page 43,
Section 10.3.
10.1.9 Gas Supply
All aspects of the gas installation, including the gas
meter, must be inspected, tested for so
undness and
purged in accordance with local and national codes.
Ensure that the air is fully purged from the heater
inlet pipe up to the main gas valve inlet test nipple.
Adjust the pressure switch located on the Dungs gas
valve to 50% of its minimum inlet working pressure.
10.1.10 Before Operating the Heater
Ensure the burner head, air damper and pressu re
switch settings are adjusted for the correct burner in
accordance with the Data Tables on Page 11,
Section 4.4 through Page 14, Section 4.8 (see the
burner reference letter on data plate).
To ensure that all the controls are in safe working
order, operate the heater for the first time with the
isolating gas valve turned off.
1. Turn off the gas isolating valve
2. Using the installed external control, turn on the
burner. The automatic sequence w
ill now begin
as described on Page 43, Figure 18.
There will be no ignition of the burner and lockout
will occur, which proves the controls are operating
correctly.
10.2 Commissioning the Single Stage Burner
(gas heaters)
Follow the manufacturer's instructions and the data
provided on Page 11, Section 4.4 through Page 14,
Section 4.8.
L
N
Less Than
0.1 ohm
ohm
V
230v 50Hz AC
V
0v
(must be less than 15v)
Supply
Earth
Terminal
20
40
60
80
100
120
Set Point 1
Fan Off
Set to 38°C
Set Point 3
Limit
Set to 110°C
Set Point 2
Fan On
Set to 60-65°C